Herman Hill – London

Escape of water / flooding, recommendations for drying out, insurance procedures and total refurbishment.

Escape of water / flooding, recommendations for drying out, insurance procedures and total refurbishment.

An old client with a property that had been left empty for 12 months had a burst pipe during a very cold winter. The building became saturated and the interior covered in mould. The complete building required renovation and repair. Although the problem was solved it was decided to modernise throughout and rent the property to provide passive income for their mother in a care home.